12-2-25-snyatie-i-ustanovka-okonnykh-ram-dvernykh-sborok.html
12.2.25. Removal and installation of window frames of door assembliesForward doors
Order of removal of a window frame of a forward door
|
- Remove glass of a door window (see. Sections Removal and installation of window frames of door assemblies and Removal and installation of elements of a glazing of a body).
- Liberate from a window aperture a rubber sealant (1), - in case of need prepare a replaceable sealing element.
- Turn out screws (shooters) of fastening of a window frame (2).
- Liberate from clamps and remove a facing frame (3) window apertures.
- Turn out screws (4) at the left and on the right in the lower part of a frame (2), then take the last from a window aperture, having pulled up and outside.
- Installation is made upside-down, - the facing frame should be established before frame fixing.
- In summary make sure of smoothness of a course of lowering / поднимания door glass.
|
|
Back doors
|
Window frames of back doors act in film assembled with glasses. |
Order of removal of a window frame of a back door (1 of 2)
Order of removal of a window frame of a back door (2 of 2)
|
- Remove an internal upholstery of a door (see. Section Removal and installation of an internal upholstery of door assemblies).
- Remove the bottom sealing element (1) window aperture, - try not to break off a uvula of a forward clamp. The damaged sealant is subject to replacement.
- Liberate from a window aperture a rubber sealant (2).
- Turn out bolts (shooters) of fastening of a frame (3).
- Release clamps and remove a facing frame (4).
- Establish into place a rubber sealant (2) and completely lift glass (8).
- Accurately remove a film insulating cover of a door (see. The section Removal and installation of an internal upholstery of door assemblies), - it is necessary to replace the damaged film.
- Turn out fixing bolts (5 and 6) at the left and on the right in the lower part of a frame (3).
- Take measures against falling of glass and turn out screws (7) of its fastening to a regulator.
- Having submitted outside, accurately take a frame (3) assembled with glass (8) from a window aperture.
- Installation is made upside-down, - the facing frame should be established before frame fixing.
|
The tightening of screws (7) should be made only after the lifted glass (8) it will be leveled in a window aperture. |
- In summary make sure of smoothness of a course of lowering / поднимания door glass.
|
|
|
|