12-2-30-snyatie-i-ustanovka-ramy-verkhnego-lyuka.html
12.2.30. Removal and installation of a frame of the top hatch
Details of installation of a frame of the top hatch (1 of 3)
Details of installation of a frame of the top hatch (2 of 3)
Details of installation of a frame of the top hatch (3 of 3)
Removal
Installation
|
- Establish in lateral directing and in flutes of a folding bracket (arrow) at the left and on the right conductors (6).
-
|
Conductors it is necessary to remove only after installation of a cover of the hatch. |
- Fill a frame (1) on the regular place, having taken care of reliability of sealing of a landing gap.
- Screw and tighten fixing bolts (4), then take care of correctness of connection of drainage hoses (2) and a directing tube (3).
- Further installation is made as it should be, the return to an order of dismantle of components, - do not forget to remove after installation of a cover conductors (6).
|
|
|
|