Mercedes-Benz G-class (W463) since 1999 of release
1. Introduction
2. Governing bodies and operation receptions
3. Current leaving and service
4. Engine
5. Systems of cooling, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Automatic transmission
9. Transmission line
9.1. A full drive - the general information
9.2. Transfer case
9.3. Bridges
9.3.1. General information
9.3.2. Check and adjustment oil level / replacement in assemblies of bridges
9.3.3. Check of stuffing by greasing of sharnirny casings of rotary assemblies of the forward bridge
9.3.4. Adjustment of wheel bearings of a forward axis
9.3.5. Check of concentricity of landing of connecting flanges of leading gear wheels of the main transfers
9.3.6. Replacement of epiploons of leading gear wheels of the main transfers
9.3.7. Removal and installation of leading gear wheels of the main transfers
9.3.8. Removal, installation and adjustment of executive cylinders and components of the mechanism of a drive of blocking of interwheel differentials
9.3.9. Dismantling and assembly of the executive cylinder of a drive of blocking of differential
9.3.10. Removal and installation of naves of forward wheels
9.3.11. Dismantling and assembly of naves of forward wheels
9.3.12. Removal and installation of power shafts of the forward bridge
9.3.13. Adjustment of bearings of rotary knots
9.3.14. Dismantling and assembly of a sharnirny casing of the forward bridge
9.3.15. Dismantling and assembly of a power shaft
9.3.16. Removal and installation of semi-axes
9.3.17. Dismantling and semi-axis assembly
9.3.18. Removal and installation of assemblies of interwheel differentials with conducted gear wheels of the main transfers
9.3.19. Dismantling and assembly of interwheel differentials
9.3.20. Check of correctness of gearing of gear wheels of the main transfer
9.3.21. Removal and installation of assemblies of the forward and back bridge
10. Brake and auxiliary systems
11. Suspension bracket and steering
12. Body
13. Onboard electric equipment
14. Schemes of electric connections


 









9-3-3-proverka-nabivki-smazkojj-sharnirnykh-kozhukhov-povorotnykh-sborok-perednego-mosta.html

9.3.3. Check of stuffing by greasing of sharnirny casings of rotary assemblies of the forward bridge

Sharnirnye casings of rotary knots of the forward bridge are equipped with carving jams (1)


 PERFORMANCE ORDER

  1. For check of a sharnirny casing of the right power shaft of a wheel it is necessary to develop against the stop to the left and on the contrary.
  2. Turn out from a checked casing a carving stopper (1).
  3. Greasing level in a casing should reach the bottom cut of a control opening. In case of need make the corresponding adjustment, having finished in a casing the corresponding amount of greasing of a demanded grade by means of the lubricant gun with the flexible nozzle which end it is necessary to fill in a control opening.
  4. Do not forget to screw and tighten with demanded effort a stopper (1).


«previous page
9.3.2. Check and adjustment oil level / replacement in assemblies of bridges
following page»
9.3.4. Adjustment of wheel bearings of a forward axis