9-3-14-razborka-i-sborka-sharnirnogo-kozhukha-perednego-mosta.html
9.3.14. Dismantling and assembly of a sharnirny casing of the forward bridge
Details of installation of a sharnirny casing (1 of 2)
Details of installation of a sharnirny casing (2 of 2)
|
- Remove a sharnirny casing (1) assembled with a power shaft and take the last (see. Section Removal and installation of power shafts of the forward bridge).
- Remove a wheel nave (see. Section Removal and installation of naves of forward wheels).
- Remove a sealing ring (7).
- Remove an external holder (2).
- Remove the konusny roller bearing (3) and an epiploon (4).
- Carefully wipe the removed components, in case of need prepare replacement.
- Establish a face cover (8) and an external holder (9).
- Establish an external holder (5).
- Grease the bearing (3) and plant it on the regular place in a casing (1).
- Establish an epiploon (4), previously having greased it on perimeter with hermetic.
|
Epiploons in an obrezinenny edge on hermetic do not need installation. |
- Establish an external holder (2).
- Having greased with hermetic, establish a sealing ring (7), having planted it in a nest aflush (0.3 mm are not deeper).
- Further installation is made as it should be, the return to an order of dismantle of components.
|
|
|
|