Mercedes-Benz G-class (W463) since 1999 of release
1. Introduction
2. Governing bodies and operation receptions
3. Current leaving and service
4. Engine
5. Systems of cooling, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Automatic transmission
9. Transmission line
9.1. A full drive - the general information
9.2. Transfer case
9.3. Bridges
9.3.1. General information
9.3.2. Check and adjustment oil level / replacement in assemblies of bridges
9.3.3. Check of stuffing by greasing of sharnirny casings of rotary assemblies of the forward bridge
9.3.4. Adjustment of wheel bearings of a forward axis
9.3.5. Check of concentricity of landing of connecting flanges of leading gear wheels of the main transfers
9.3.6. Replacement of epiploons of leading gear wheels of the main transfers
9.3.7. Removal and installation of leading gear wheels of the main transfers
9.3.8. Removal, installation and adjustment of executive cylinders and components of the mechanism of a drive of blocking of interwheel differentials
9.3.9. Dismantling and assembly of the executive cylinder of a drive of blocking of differential
9.3.10. Removal and installation of naves of forward wheels
9.3.11. Dismantling and assembly of naves of forward wheels
9.3.12. Removal and installation of power shafts of the forward bridge
9.3.13. Adjustment of bearings of rotary knots
9.3.14. Dismantling and assembly of a sharnirny casing of the forward bridge
9.3.15. Dismantling and assembly of a power shaft
9.3.16. Removal and installation of semi-axes
9.3.17. Dismantling and semi-axis assembly
9.3.18. Removal and installation of assemblies of interwheel differentials with conducted gear wheels of the main transfers
9.3.19. Dismantling and assembly of interwheel differentials
9.3.20. Check of correctness of gearing of gear wheels of the main transfer
9.3.21. Removal and installation of assemblies of the forward and back bridge
10. Brake and auxiliary systems
11. Suspension bracket and steering
12. Body
13. Onboard electric equipment
14. Schemes of electric connections


 









9-3-14-razborka-i-sborka-sharnirnogo-kozhukha-perednego-mosta.html

9.3.14. Dismantling and assembly of a sharnirny casing of the forward bridge

Details of installation of a sharnirny casing (1 of 2)

1 — Sharnirny a casing
2, 5 — External holders
3, 6 — Konusnye roller bearings

4 — the Epiploon
7 — the Sealing ring

Details of installation of a sharnirny casing (2 of 2)

8 — the Cover
9 — the External holder
10 — Konusny the roller bearing

11 — the Ring

 PERFORMANCE ORDER

  1. Remove a sharnirny casing (1) assembled with a power shaft and take the last (see. Section Removal and installation of power shafts of the forward bridge).
  2. Remove a wheel nave (see. Section Removal and installation of naves of forward wheels).
  3. Remove a sealing ring (7).
  4. Remove an external holder (2).
  5. Remove the konusny roller bearing (3) and an epiploon (4).
  6. Carefully wipe the removed components, in case of need prepare replacement.
  7. Establish a face cover (8) and an external holder (9).
  8. Establish an external holder (5).
  9. Grease the bearing (3) and plant it on the regular place in a casing (1).
  10. Establish an epiploon (4), previously having greased it on perimeter with hermetic.

Epiploons in an obrezinenny edge on hermetic do not need installation.

  1. Establish an external holder (2).
  2. Having greased with hermetic, establish a sealing ring (7), having planted it in a nest aflush (0.3 mm are not deeper).
  3. Further installation is made as it should be, the return to an order of dismantle of components.


«previous page
9.3.13. Adjustment of bearings of rotary knots
following page»
9.3.15. Dismantling and assembly of a power shaft