Mercedes-Benz G-class (W463) since 1999 of release
1. Introduction
2. Governing bodies and operation receptions
3. Current leaving and service
4. Engine
5. Systems of cooling, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Automatic transmission
9. Transmission line
9.1. A full drive - the general information
9.2. Transfer case
9.3. Bridges
9.3.1. General information
9.3.2. Check and adjustment oil level / replacement in assemblies of bridges
9.3.3. Check of stuffing by greasing of sharnirny casings of rotary assemblies of the forward bridge
9.3.4. Adjustment of wheel bearings of a forward axis
9.3.5. Check of concentricity of landing of connecting flanges of leading gear wheels of the main transfers
9.3.6. Replacement of epiploons of leading gear wheels of the main transfers
9.3.7. Removal and installation of leading gear wheels of the main transfers
9.3.8. Removal, installation and adjustment of executive cylinders and components of the mechanism of a drive of blocking of interwheel differentials
9.3.9. Dismantling and assembly of the executive cylinder of a drive of blocking of differential
9.3.10. Removal and installation of naves of forward wheels
9.3.11. Dismantling and assembly of naves of forward wheels
9.3.12. Removal and installation of power shafts of the forward bridge
9.3.13. Adjustment of bearings of rotary knots
9.3.14. Dismantling and assembly of a sharnirny casing of the forward bridge
9.3.15. Dismantling and assembly of a power shaft
9.3.16. Removal and installation of semi-axes
9.3.17. Dismantling and semi-axis assembly
9.3.18. Removal and installation of assemblies of interwheel differentials with conducted gear wheels of the main transfers
9.3.19. Dismantling and assembly of interwheel differentials
9.3.20. Check of correctness of gearing of gear wheels of the main transfer
9.3.21. Removal and installation of assemblies of the forward and back bridge
10. Brake and auxiliary systems
11. Suspension bracket and steering
12. Body
13. Onboard electric equipment
14. Schemes of electric connections


 









9-3-19-razborka-i-sborka-mezhkolesnykh-differencialov.html

9.3.19. Dismantling and assembly of interwheel differentials

Peredny Bridge

Design of interwheel differential of the forward bridge

1 — the Conducted gear wheel of the main transfer
2 — Konusnye roller bearings
3 — a differential Box
4 — Lateral gear wheels

5 — the Crosspiece
6 — Satellites
7 — Spherical washers

 PERFORMANCE ORDER

  1. Remove differential assembled with a conducted gear wheel of the main transfer (see. The section Removal and installation of assemblies of interwheel differentials with conducted gear wheels of the main transfers).
  2. Turn out fixing bolts and remove a conducted gear wheel (1).
  3. By means of a suitable stripper dismantle konusny roller bearings (2).
  4. Uncover a box of differential (3), - mark the provision of spherical washers, gear wheels and a crosspiece from each other and concerning a box. Also mark the provision of a cover concerning a box.
  5. Remove one of lateral gear wheels (4) with an adjusting washer.
  6. Take assembly of a crosspiece (5) with satellites (6).
  7. Remove satellites (6) with spherical washers (7).
  8. Remove the second lateral gear wheel (4).
  9. Carefully wipe the removed components, defective details replace.
  10. Installation is made upside-down, - adjusting washers should be developed by flutes to lateral gear wheels. Track correctness of combination of the adjusting labels put in the course of dismantle. Before installation of conic bearings check resistance lateral to a gear wheel a provorachivaniya, - in case of need pick up replaceable adjusting washers.

Before a napressovka bearings should be warmed up to order temperature 80°С, - bearings should be planted end-to-end with differential gear wheels.

Zadny Bridge

Design of interwheel differential of the back bridge

1 — the Conducted gear wheel of the main transfer
2, 12 — Konusnye roller bearings
3 — a differential Box
4 — Lateral gear wheels
5 — the Crosspiece

6 — Satellites
7 — Spherical washers
8, 11 — Bolts
9 — Persistent washers
10 — the Cover

 PERFORMANCE ORDER

  1. Remove differential assembled with a conducted gear wheel of the main transfer (see. The section Removal and installation of assemblies of interwheel differentials with conducted gear wheels of the main transfers).
  2. By means of a suitable stripper dismantle the konusny roller bearing (2) (from a conducted gear wheel).
  3. Turn out fixing bolts and remove from a box (3) conducted gear wheel (1).
  4. By means of a suitable stripper dismantle the konusny roller bearing (12) (from a box).
  5. Previously having marked adjusting situation, separate from a box (3) cover (10).
  6. Remove the first lateral gear wheel (4) with a persistent washer (9).
  7. Take a crosspiece (5) with satellites (6) and spherical washers (7).
  8. Take the second lateral gear wheel (4) with a washer (9).
  9. Carefully wipe the removed components, defective details replace.
  10. Installation is made upside-down, - adjusting washers should be developed by flutes to lateral gear wheels. Track correctness of combination of the adjusting labels put in the course of dismantle. Before installation of conic bearings check resistance of differential to a provorachivaniye (before a napressovka konusny bearings should be warmed up to order temperature 80°С, - bearings should be planted end-to-end with differential gear wheels).

Thinner adjusting washer should be established from a conducted gear wheel for the purpose of providing sufficient люфта gearings.



«previous page
9.3.18. Removal and installation of assemblies of interwheel differentials with conducted gear wheels of the main transfers
following page»
9.3.20. Check of correctness of gearing of gear wheels of the main transfer