Mercedes-Benz G-class (W463) since 1999 of release
1. Introduction
2. Governing bodies and operation receptions
3. Current leaving and service
3.1. Specifications
3.2. Active system of the prevention of term of approach planned THAT (ASSYST)
3.3. Schedule of routine maintenance
3.4. General information on settings
3.5. Check of levels of liquids, control of leaks
3.6. Check of a condition of tires and pressure in them, designation of tires and disks of wheels, rotation of wheels
3.7. Replacement of impellent oil and oil filter
3.8. Check of brake system
3.9. Power supply system check, replacement of the fuel filter
3.10. Check of a condition and replacement of hoses of an impellent compartment, localization of leaks
3.11. Check of a condition of multicostal belts of a drive of auxiliary units
3.12. Check of functioning of system of cooling and frost resistance of cooling liquid, liquid replacement
3.13. Check of a condition of system of production of the fulfilled gases
3.14. ATF and AT filter replacement
3.15. Visual check of tightness of automatic transmission
3.16. Check of a condition of components of a suspension bracket and steering
3.17. Check of a condition of boots of power shafts
3.18. Check of central air of air
3.19. Greasing of limiters of doors and cylinders of locks
3.20. Visual control of seat belts and modules of safety cushions
3.21. Check of operability of headlights and horn
3.22. Check of a condition and replacement of brushes of screen wipers
3.23. Check of a condition of the battery, care of it and charging
3.24. Replacement of the salonny filter
3.25. Replacement of liquid of a drive of blocking of differential
3.26. Replacement of brake liquid
3.27. Check and replacement of spark plugs, check of a condition of high-voltage wires (petrol models)
3.28. Replacement of candles of an incandescence (diesel models)
4. Engine
5. Systems of cooling, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Automatic transmission
9. Transmission line
10. Brake and auxiliary systems
11. Suspension bracket and steering
12. Body
13. Onboard electric equipment
14. Schemes of electric connections


 









3-4-obshhaya-informaciya-o-nastrojjkakh.html

3.4. General information on settings

The term "control" is used in this Management for designation rather of a complex of procedures, than one separate procedure.

If from the moment of car purchase the schedule of routine maintenance is strictly observed, frequent checks of level of liquids and a condition of components subject to raised wear as it is offered in this Management will be carried out, the engine will long remain in a good working condition, and need for carrying out any additional work will be minimized.

Is more often, however, happens so that the engine works inefficiently owing to neglect with regular service. Even more often it happens upon purchase of the second-hand car which owners did not trouble themselves with frequent and regular checks and service. In this case, besides performance of usual procedures on routine maintenance, it will be necessary to make setup of the engine.

The first step in any procedure of control or diagnostics for the purpose of improvement of operation of the engine is check of extent of compression in cylinders. Compression check (address to Head the Engine) will help to define a condition of internal components of the engine and should serve as the index at carrying out control and repair. If, for example, check of extent of compression indicates serious internal wear of the engine, usual control will not help to improve its work and will be waste of time and money. As procedure of check of extent of compression is the extremely important, the expert owning the equipment specially intended for this purpose should see off her.

For engine reduction in a good working condition performance of the following procedures more often is required:

Minimum settings

General settings

In addition to the settings listed in the previous list:



«previous page
3.3. Schedule of routine maintenance
following page»
3.5. Check of levels of liquids, control of leaks