Mercedes-Benz G-class (W463) since 1999 of release
1. Introduction
2. Governing bodies and operation receptions
3. Current leaving and service
4. Engine
5. Systems of cooling, heating, ventilation and air conditioning
5.1. System of cooling of the engine
5.2. Systems of ventilation, heating and air conditioning
5.2.1. General information and security measures
5.2.2. Removal and control panel installation by functioning of systems of heating / ventilation / air conditioning
5.2.3. Removal and installation of the salonny filter
5.2.4. Removal and installation of the fan of the heater / conditioner of air and its module of management
5.2.5. Removal and installation of the heat exchanger of a heater
5.2.6. Removal and installation of the circulating pump of a heater
5.2.7. Removal and installation of back ventilating guards
5.2.8. Check of level of a coolant in a working path of To/in system
5.2.9. Removal and installation of sensors of To/in system
5.2.10. Removal and installation of auxiliary ventilyatorny assembly
5.2.11. Removal and installation of the electromotor of a drive of a ventilating zaslonka
5.2.12. Removal and installation of the step-by-step electromotor of a drive of a zaslonka of switching of modes of air circulation
5.2.13. Removal and installation of the electromotor of a drive of a mixing zaslonka
5.2.14. Removal and installation of the evaporator of To/in system and its casing
5.2.15. Removal and installation of the compressor of To/in system
5.2.16. Removal and installation of the condenser of To/in system
5.2.17. Removal and installation of the broad valve
5.2.18. Removal and receiver dehumidifier installation
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Automatic transmission
9. Transmission line
10. Brake and auxiliary systems
11. Suspension bracket and steering
12. Body
13. Onboard electric equipment
14. Schemes of electric connections


 









5-2-7-snyatie-i-ustanovka-zadnikh-ventilyacionnykh-shhitkov.html

5.2.7. Removal and installation of back ventilating guards

Except models with special protection (code 979)

Details of installation of back ventilating guards

 PERFORMANCE ORDER

  1. Remove a protective overlay (1) panel (2) furnish of a back rack.
  2. Remove the finishing panel (2).
  3. At the corresponding complete set disconnect electroconducting of an alarm buzzer of movement by a backing (BA) (only for the right ventilating guard).
  4. Remove the back lateral panel of furnish (see. Head Body).
  5. Release a collar (3) and disconnect a hose (4).
  6. Remove a spring clamp (5) and a ventilating casing (6).
  7. Uncover (7), a sealing element (8) and a molding (9).
  8. Installation is made upside-down.


previous page
5.2.6. Removal and installation of the circulating pump of a heater
following page
5.2.8. Check of level of a coolant in a working path of To/in system