5-2-2-snyatie-i-ustanovka-paneli-upravleniya-funkcionirovaniem-sistem-otopleniya.html
5.2.2. Removal and control panel installation by functioning of systems of heating / ventilation / air conditioning
Details of installation of the control panel functioning of systems of heating/ventilation/air conditioning (HVAC) (N22)
|
- Turn on the auxiliary accumulator and connect it to the regular battery, then disconnect from the last a negative wire.
|
|
- Uncover the central (console) section of the dashboard (see. Head Body).
- The control panel is simply latched by functioning of HVAC (N22) in clamps of a cover and for removal it should be pulled outside.
- Installation is made upside-down, - track reliability of a zashchelkivaniye of clamps of the panel.
|
|
|
|