Mercedes-Benz G-class (W463) since 1999 of release
1. Introduction
2. Governing bodies and operation receptions
3. Current leaving and service
4. Engine
5. Systems of cooling, heating, ventilation and air conditioning
5.1. System of cooling of the engine
5.2. Systems of ventilation, heating and air conditioning
5.2.1. General information and security measures
5.2.2. Removal and control panel installation by functioning of systems of heating / ventilation / air conditioning
5.2.3. Removal and installation of the salonny filter
5.2.4. Removal and installation of the fan of the heater / conditioner of air and its module of management
5.2.5. Removal and installation of the heat exchanger of a heater
5.2.6. Removal and installation of the circulating pump of a heater
5.2.7. Removal and installation of back ventilating guards
5.2.8. Check of level of a coolant in a working path of To/in system
5.2.9. Removal and installation of sensors of To/in system
5.2.10. Removal and installation of auxiliary ventilyatorny assembly
5.2.11. Removal and installation of the electromotor of a drive of a ventilating zaslonka
5.2.12. Removal and installation of the step-by-step electromotor of a drive of a zaslonka of switching of modes of air circulation
5.2.13. Removal and installation of the electromotor of a drive of a mixing zaslonka
5.2.14. Removal and installation of the evaporator of To/in system and its casing
5.2.15. Removal and installation of the compressor of To/in system
5.2.16. Removal and installation of the condenser of To/in system
5.2.17. Removal and installation of the broad valve
5.2.18. Removal and receiver dehumidifier installation
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Automatic transmission
9. Transmission line
10. Brake and auxiliary systems
11. Suspension bracket and steering
12. Body
13. Onboard electric equipment
14. Schemes of electric connections


 









5-2-17-snyatie-i-ustanovka-rasshiritelnogo-klapana.html

5.2.17. Removal and installation of the broad valve

All sealing elements are subject to replacement without fail!

Details of installation of the broad valve
9 — Bolts
10 — the Broad valve
11 — Sealing laying

 PERFORMANCE ORDER

  1. Remove an evaporator casing (see. Section Removal and installation of the evaporator of To/in system and its casing).
  2. Remove sealing laying (11), - in case of need prepare a replaceable sealing element.
  3. Turn out fixing bolts (9) and remove the broad valve (10).
  4. Installation is made upside-down.
  5. In summary make sure of serviceability of functioning of К/В system.


«previous page
5.2.16. Removal and installation of the condenser of To/in system
following page»
5.2.18. Removal and receiver dehumidifier installation