Mercedes-Benz G-class (W463) since 1999 of release
1. Introduction
2. Governing bodies and operation receptions
3. Current leaving and service
4. Engine
5. Systems of cooling, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Automatic transmission
9. Transmission line
10. Brake and auxiliary systems
11. Suspension bracket and steering
11.1. Specifications
11.2. Forward suspension bracket
11.3. Back suspension bracket
11.4. Steering
11.4.1. General information
11.4.2. Check of a pressure of the steering pump
11.4.3. Check and adjustment of the hydraulic limiter
11.4.4. Adjustment of a steering shaft
11.4.5. Assessment of a condition of components of a steering drive
11.4.6. Removal and installation of a steering wheel
11.4.7. Removal and installation of a contact cable drum of a steering wheel
11.4.8. Removal and installation of the sensor of an angle of rotation of a steering wheel
11.4.9. Removal and installation of the mechanism of an electronic blokirator of a steering column
11.4.10. Removal and installation of a steering column with the adjustment electric drive
11.4.11. Removal and installation of the steering pump
11.4.12. Removal and installation of the line of cooling of GUR liquid
11.4.13. Removal and installation of the steering mechanism
11.4.14. Design of the steering mechanism
11.5. Suspension bracket geometry
12. Body
13. Onboard electric equipment
14. Schemes of electric connections


 









11-4-6-snyatie-i-ustanovka-rulevogo-kolesa.html

11.4.6. Removal and installation of a steering wheel

Details of installation of a steering wheel

1 — I Will corrode electroconductings of the device of heating of a steering wheel
32 — the Steering wheel

32с — the Screw with a secret head

Contact cable drum (А45) of a steering wheel


 PERFORMANCE ORDER

  1. Develop a steering wheel (3) in the situation corresponding to rectilinear movement.
  2. Take a key from the ignition lock, - should work the device of electronic blocking of a column (ESC).
  1. Turn on the auxiliary accumulator and connect it to the regular battery, then disconnect from the last a negative wire.

    7 — the Auxiliary accumulator
    8 — the Plug of a positive wire of the module
    9 — the Plug of a negative wire of the module
    W10 — battery Grounding
  1. Remove from a steering wheel the safety cushion module (see. Head Onboard electric equipment).
  2. On models of the corresponding complete set (release from 01.07.02 with the VL0 code) disunite the socket (1) electroconducting of the device of heating of a steering wheel.
  3. Having fixed a steering wheel (32) it is motionless, turn out the screw with a secret head (32с), - the screw is subject to replacement without fail.
  4. Passing safety cushion electroconducting through an opening through passage, remove a steering wheel, previously having marked its adjusting situation on a column shaft.
  5. Visually estimate a condition of a contact cable drum (А45), in case of need make its replacement (see. Section Removal and installation of a contact cable drum of a steering wheel).
  6. Installation is made upside-down, track correctness of combination put in the course of dismantle of a wheel of landing labels.


«previous page
11.4.5. Assessment of a condition of components of a steering drive
following page»
11.4.7. Removal and installation of a contact cable drum of a steering wheel