Mercedes-Benz G-class (W463) since 1999 of release
1. Introduction
2. Governing bodies and operation receptions
3. Current leaving and service
4. Engine
5. Systems of cooling, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Automatic transmission
9. Transmission line
9.1. A full drive - the general information
9.2. Transfer case
9.2.1. Oil replacement in a transfer case
9.2.2. Removal and installation of the module of management of a transfer case
9.2.3. Removal and installation of a vacuum receiver of a control system by blocking of differentials
9.2.4. Removal and installation of the vacuum pump of a drive of blocking of differentials
9.2.5. Removal and installation of the servomotor of a transfer case
9.2.6. A detachment and connection of driveshafts on a transfer case
9.2.7. Removal and installation of a transfer case
9.2.8. Removal and installation of support of a suspension bracket of a transfer case
9.2.9. Design of a transfer case
9.2.10. Replacement of epiploons
9.2.11. Removal and installation of the executive cylinder of a drive of blocking of interaxal differential
9.2.12. Removal and installation of a forward cover
9.2.13. Removal and installation of a cover of the bearing of an intermediate flange
9.2.14. Dismantling and assembly of a cover of the bearing
9.2.15. Removal and installation of a cover of an intermediate flange
9.2.16. Removal and installation of an intermediate flange
9.2.17. Removal and installation of interaxal differential
9.2.18. Dismantling and assembly of interaxal differential
9.2.19. Removal and installation of entrance and intermediate shaft
9.2.20. Dismantling entrance (leading shaft)
9.2.21. Dismantling of an intermediate shaft
9.2.22. Removal and installation of components of the mechanism of inclusion of blocking of interaxal differential
9.2.23. Removal and installation of components of the mechanism of switching of modes of a transfer case
9.3. Bridges
10. Brake and auxiliary systems
11. Suspension bracket and steering
12. Body
13. Onboard electric equipment
14. Schemes of electric connections


 









9-2-8-snyatie-i-ustanovka-opor-podveski-razdatochnojj-korobki.html

9.2.8. Removal and installation of support of a suspension bracket of a transfer case

Details of installation of support of a suspension bracket of a transfer case

1 — the Lever of a forward support
2 — the Lever of the right back support
3 — the Lever of the left back support

4 — the Pillow of a forward support
5 — the Pillow of the right back support
6 — the Pillow of the left back support

Details of installation of a pillow of a forward support

Details of installation of pillows of back support

 PERFORMANCE ORDER

  1. Prop up a transfer case from below, turn out the corresponding fixture, separate levers (1, 2 and 3) support of its suspension bracket from rubber pillows and remove.
  2. Installation is made upside-down.


«previous page
9.2.7. Removal and installation of a transfer case
following page»
9.2.9. Design of a transfer case