Mercedes-Benz G-class (W463) since 1999 of release
1. Introduction
2. Governing bodies and operation receptions
3. Current leaving and service
4. Engine
5. Systems of cooling, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
6.1. General information and security measures
6.2. Power supply system of petrol engines
6.3. Power supply system of diesel engines
6.3.1. General information
6.3.2. Checks of system of injection of fuel
6.3.3. Service of components of an inlet air path
6.3.4. Service of components of a drive of a butterfly valve
6.3.5. Oporozhneniye of a fuel tank
6.3.6. Removal and installation of the sensor of a stock of fuel
6.3.7. Air removal from a contour of low pressure of a fuel path
6.3.8. Removal and installation of the preliminary fuel pump
6.3.9. Removal and installation of the fuel pump of a high pressure (TNVD)
6.3.10. Removal and installation of the fuel distributive highway and nozzles
6.3.11. Removal and installation of the sensor of pressure in the fuel highway
6.3.12. Removal and installation of the valve regulator of pressure of fuel
6.3.13. Removal and installation of klapanny assembly
6.3.14. Removal and installation of a cooler of fuel
6.3.15. Removal and installation of a low-temperature cooler
6.3.16. Removal and installation of the module of management by fuel injection
6.3.17. Removal and installation of a fuel tank
6.4. Systems of release and decrease in toxicity of the fulfilled gases
7. Systems of electric equipment of the engine
8. Automatic transmission
9. Transmission line
10. Brake and auxiliary systems
11. Suspension bracket and steering
12. Body
13. Onboard electric equipment
14. Schemes of electric connections


 









6-3-9-snyatie-i-ustanovka-toplivnogo-nasosa-vysokogo-davleniya-tnvd.html

6.3.9. Removal and installation of the fuel pump of a high pressure (TNVD)

Models 463.323 (М612)

Details of TNVD installation (М612)

1 — the Pressure head line
2 — ТНВД
3 — the Carving union
4, 5 — Arms
6 — the Line of return of fuel

7 — Collars
8 — Bolts
9 — the Driving element
10 — the Sealing ring

 PERFORMANCE ORDER

  1. Remove panels of furnish of a cover of a head of cylinders.
  2. Remove a belt of a drive of auxiliary units (see. Head Engine).
  3. To Otboltita from TNVD (2) the pressure head line (1), - do not weaken the carving union (3) which should be held from a provorachivaniye the second key. Disconnect from a lifting eye of the power unit an arm (4).
  4. Remove from pump assembly (2) arm (5).
  5. Release fixing collars (7) and take aside lines of return of fuel (6).
  6. Disconnect the returnable line (6) from TNVD (2), - prepare for collecting spilled fuel.

The sealing ring is subject to replacement without fail.

  1. Turn out bolts (8) and remove TNVD (2) assembly.

TNVD is not subject to dismantling! In case of need the driving element (9) can be removed from it (prepare a replaceable sealing ring (10).

  1. Installation is made upside-down. Do not forget to replace sealing elements, track observance of purity of interfaced surfaces and correctness of landing of a driving element (9).

The worn-out driving element (9) is replaced complete with an intermediate asterisk of a drive of TNVD.

  1. In summary make cleaning of memory of the processor of system of onboard self-diagnostics (see. Head of System of electric equipment of the engine).

Models 463.333 (М628)

Details of TNVD installation of the M628 engine (1 of 2)

1 — ТНВД
2 — the Line of supply of fuel
3 — the TNVD Pressure head line
3а — the Carving union
4 — the Line of return of fuel
5 — the Bolt
6 — the Floating coupling of an advancing of a corner of injection

7 — the Sealing ring
8 — the Bolt
9 — the Preliminary fuel pump
10 — the Driving element
11 — the Sealing ring
12 — the Bolt
Y94 — the Valve of quality control of a mix

Details of TNVD installation of the M628 engine (2 of 2)

1 — ТНВД
6 — the Floating coupling of an advancing of a corner of injection

13 — the Intermediate asterisk of a drive of TNVD with the centrifugal proof-reader
14 — the Nest

 PERFORMANCE ORDER

  1. Remove an air purifier and the activator of a drive of a butterfly valve with the top air lines (see. Section Service of components of an inlet air path).
  2. For Otboltita from TNVD (1) pressure head line (3) and the line of return of fuel (4), - prepare replaceable sealing elements (a cone and a ring).

The carving union (3а) should be held from a provorachivaniye by means of the second key.

  1. Disconnect a line of communication (shooter) from the valve of control of quantity of a mix (Y94).
  2. Turn out bolts (5) and remove TNVD (1) assembly.

Do not open TNVD assembly, - in case of need remove the floating coupling (6)!

  1. Estimate degree of wear of the coupling (6), in case of need make its replacement (assembled with an intermediate gear wheel of TNVD and the centrifugal proof-reader (13)).
  2. Installation is made upside-down, - track, that at TNVD installation a nest (14) intermediate asterisks were developed in the same direction, as a zero label (arrow). Do not forget to replace a sealing element of a natyazhitel. Do not forget to replace all sealing elements, track observance of purity of interfaced surfaces.
  3. In summary make cleaning of memory of the processor of system of onboard self-diagnostics (see. Head of System of electric equipment of the engine).


«previous page
6.3.8. Removal and installation of the preliminary fuel pump
following page»
6.3.10. Removal and installation of the fuel distributive highway and nozzles