Mercedes-Benz G-class (W463) since 1999 of release
1. Introduction
2. Governing bodies and operation receptions
3. Current leaving and service
4. Engine
5. Systems of cooling, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Automatic transmission
8.1. Specifications
8.2. Search of malfunctions - the general information
8.3. The general principles of functioning of a control system of the transmission, operating signals
8.4. Adjustment of a drive of switching of AT
8.5. Removal and installation of the electrohydraulic control unit by switchings
8.6. Removal and AT installation with the hydrotransformer
8.7. Removal and installation of the selector module (ESM)
8.8. Removal and installation of the sensor of target turns of AT
8.9. Removal and installation of a cooler of ATF
8.10. Washing of a cooler of ATF and oil pipelines
8.11. Removal and installation of the electronic module of management by transmission (TCM/ETC)
9. Transmission line
10. Brake and auxiliary systems
11. Suspension bracket and steering
12. Body
13. Onboard electric equipment
14. Schemes of electric connections


 









8-10-promyvka-okhladitelya-atf-i-masloprovodov.html

8.10. Washing of a cooler of ATF and oil pipelines

Set for washing of a cooler of ATF

1 — the Connecting union
2 — the Pump
3 — the Tank
4 — Connecting branch pipes

And — the connection Direction at ATF pumping out
In — the connection Direction when washing cooler

Scheme of connection of a cooler of ATF

5 — the Submitting oil pipeline
6 — the Returnable oil pipeline

7 — the Pallet of a case of AT

 PERFORMANCE ORDER

  1. Merge transmission liquid (see. Head Current leaving and service).
  2. Connect the pump (2) to the tank (3) with the pressure head union.
  3. Fill the tank (3) with kerosene.
  4. Connect to a branch pipe (1) plastic tube and screw on one of two oil pipelines the suitable union (4)., - in case of need fix a tube on the union a collar.
  5. Other plastic tube connect to the second oil pipeline.
  6. Creating a pressure the pump (2), wash out a path kerosene, then carefully blow it the compressed air.


«previous page
8.9. Removal and installation of a cooler of ATF
following page»
8.11. Removal and installation of the electronic module of management by transmission (TCM/ETC)