1. Introduction
2. Governing bodies and operation receptions
3. Current leaving and service
4. Engine
5. Systems of cooling, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
6.1. General information and security measures
6.2. Power supply system of petrol engines
6.3. Power supply system of diesel engines
6.4. Systems of release and decrease in toxicity of the fulfilled gases
6.4.1. General information
6.4.2. Removal and installation of system of production of the fulfilled gases
6.4.3. Removal and installation of final collectors
6.4.4. Removal and installation lambda probes
6.4.5. Removal and installation of the air pump
6.4.6. Removal and installation of the valve of a purge of a coal adsorber (EVAP)
6.4.7. Removal and installation of a coal adsorber (EVAP)
6.4.8. Removal and EGR valve installation
6.4.9. Removal and installation of a cooler of EGR
6.4.10. Removal and installation of pozitsioner of EGR
6.4.11. Removal and installation of the sensor of temperature of cooling liquid (CDI)
7. Systems of electric equipment of the engine
8. Automatic transmission
9. Transmission line
10. Brake and auxiliary systems
11. Suspension bracket and steering
12. Body
13. Onboard electric equipment
14. Schemes of electric connections


 









6-4-8-snyatie-i-ustanovka-klapana-egr.html

6.4.8. Removal and EGR valve installation

Petrol models

Details of installation of the EGR valve on petrol models

19 — the Inlet pipeline
89 — the EGR Valve
89/1 — EGR Tube
89/2 — the Vacuum control unit
89/3 — Shtutsernaya a nut

and — Depression from the inlet pipeline
b — Depression of controllable depth from a transdyuser of system of a retsirkulyatsiya to the EGR valve
Y31/1 — the Vacuum transdyuser of EGR

 PERFORMANCE ORDER

  1. Uncover power a unit/air purifier (see. Section Removal and installation of components of an inlet air path).
  2. Remove an inlet air line assembled with the MAF sensor (see. Section Removal and installation of components of an inlet air path).
  3. Give a shtutserny nut (89/3) on the EGR (89) valve.
  4. Disconnect EGR (89/1) tube from the inlet pipeline (19) and a head of cylinders.
  5. Disconnect electroconducting from a transdyuser of EGR (Y31/1).
  6. Remove the EGR (89) valve.
  7. Installation is made upside-down, - in order to avoid jamming of the lever of a drive of a butterfly valve, track correctness of laying vacuum a tube, EGR (Y31/1) going from a transdyuser.


«previous page
6.4.7. Removal and installation of a coal adsorber (EVAP)
following page»
6.4.9. Removal and installation of a cooler of EGR