Mercedes-Benz G-class (W463) since 1999 of release
1. Introduction
2. Governing bodies and operation receptions
3. Current leaving and service
4. Engine
5. Systems of cooling, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Automatic transmission
9. Transmission line
10. Brake and auxiliary systems
11. Suspension bracket and steering
11.1. Specifications
11.2. Forward suspension bracket
11.2.1. General information
11.2.2. Removal and installation of assembly of the forward bridge
11.2.3. Removal, check and installation of forward shock-absorbers
11.2.4. Removal and installation of springs of a forward suspension bracket
11.2.5. Removal and installation of the forward stabilizer of cross-section stability
11.2.6. Removal and installation of longitudinal levers of a suspension bracket
11.2.7. Replacement of the rubber plug of the longitudinal lever
11.3. Back suspension bracket
11.4. Steering
11.5. Suspension bracket geometry
12. Body
13. Onboard electric equipment
14. Schemes of electric connections


 









11-2-3-snyatie-proverka-i-ustanovka-perednikh-amortizatorov.html

11.2.3. Removal, check and installation of forward shock-absorbers

Location of the top support of the right forward shock-absorber

Location of the top support of the left forward shock-absorber

Design of the bottom support of the shock-absorber


 PERFORMANCE ORDER

  1. Release a nut (arrows) and take a bolt of the top support of the shock-absorber.
  2. Under the car release a nut (1), then remove a plate (2) with the rubber plug (3) and liberate the shock-absorber from the bottom basic arm (4).
  3. Remove from the shock-absorber holders (5 and 6), the rubber bearing (7) and the remote plug (8).
  4. Estimate a condition of the rubber components, the failed elements replace.
  5. Examine the shock-absorber on existence of traces of leaks through cuffs of a working rod, in case of need prepare replaceable assemblies.
  6. Installation is made upside-down. Track, that the fixture was tightened with demanded effort.


«previous page
11.2.2. Removal and installation of assembly of the forward bridge
following page»
11.2.4. Removal and installation of springs of a forward suspension bracket