Mercedes-Benz G-class (W463) since 1999 of release
1. Introduction
2. Governing bodies and operation receptions
3. Current leaving and service
4. Engine
5. Systems of cooling, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Automatic transmission
9. Transmission line
9.1. A full drive - the general information
9.2. Transfer case
9.3. Bridges
9.3.1. General information
9.3.2. Check and adjustment oil level / replacement in assemblies of bridges
9.3.3. Check of stuffing by greasing of sharnirny casings of rotary assemblies of the forward bridge
9.3.4. Adjustment of wheel bearings of a forward axis
9.3.5. Check of concentricity of landing of connecting flanges of leading gear wheels of the main transfers
9.3.6. Replacement of epiploons of leading gear wheels of the main transfers
9.3.7. Removal and installation of leading gear wheels of the main transfers
9.3.8. Removal, installation and adjustment of executive cylinders and components of the mechanism of a drive of blocking of interwheel differentials
9.3.9. Dismantling and assembly of the executive cylinder of a drive of blocking of differential
9.3.10. Removal and installation of naves of forward wheels
9.3.11. Dismantling and assembly of naves of forward wheels
9.3.12. Removal and installation of power shafts of the forward bridge
9.3.13. Adjustment of bearings of rotary knots
9.3.14. Dismantling and assembly of a sharnirny casing of the forward bridge
9.3.15. Dismantling and assembly of a power shaft
9.3.16. Removal and installation of semi-axes
9.3.17. Dismantling and semi-axis assembly
9.3.18. Removal and installation of assemblies of interwheel differentials with conducted gear wheels of the main transfers
9.3.19. Dismantling and assembly of interwheel differentials
9.3.20. Check of correctness of gearing of gear wheels of the main transfer
9.3.21. Removal and installation of assemblies of the forward and back bridge
10. Brake and auxiliary systems
11. Suspension bracket and steering
12. Body
13. Onboard electric equipment
14. Schemes of electric connections


 









9-3-11-razborka-i-sborka-stupic-perednikh-koles.html

9.3.11. Dismantling and assembly of naves of forward wheels

Design of stupichny assembly of a forward wheel

1 — the Nave
2 — Poliuretanovoye a sealing ring

3 — Konusny the roller bearing

 PERFORMANCE ORDER

  1. Remove a nave (1) (see. Section Removal and installation of naves of forward wheels).
  2. Remove from a nave pin the konusny roller bearing (3).
  3. Remove a poliuretanovy sealing ring (2), - are subject to replacement without fail.
  4. Installation is made upside-down, do not forget to grease before installation the NEW poliuretanovy ring (2) and the bearing (3). In a cavity in a sharnirny casing between konusny roller bearings also fill about 80 grams of universal greasing.


«previous page
9.3.10. Removal and installation of naves of forward wheels
following page»
9.3.12. Removal and installation of power shafts of the forward bridge